Guide 01

Guide 01 · Selection

How to choose a used tower crane.

Five checks decide whether a used tower crane is worth buying, and four of them are structural facts you can verify from photographs and documents before you ever pay for a sea freight. The tonnage in the model name is the one number that matters least.

The short version

  • Judge a crane by rated moment at the radius you work at, not by the tonnage in the model code. A 6 t panel at 45 m needs about 302 t·m once hook block and dynamic allowance are added.
  • 16 t is not 32 t. The T600-32U plate gives 16 t per trolley on twin trolleys; the 32U is a twin-trolley class code, not a single-hook rating.
  • Free-standing height is a configuration fact, not a model fact — 78.5 m fixed against 66.8 m travelling for the same machine.
  • Four checks catch most serious problems: mast section diagonals, section serial stamps, chord wall thickness, and counterweight match to the jib.
  • No nameplate means no deal, or at best scrap-plus-rebuild value. No inspection body will certify an unidentified crane.
On this page
  1. The five checks
  2. 1 · Rated moment
  3. 2 · Model codes
  4. 3 · Free-standing height
  5. 4 · Fatigue and corrosion
  6. 5 · Documentation
  7. 14-point sheet
  8. Red flags
  9. Match to the job
  10. What it costs
  11. Questions

What decides it, in order

Buyers usually start with the price and the model name. That order is backwards. A tower crane is a fatigue structure with a load chart, and its value is set by five things you can check without running it:

  1. Rated moment at the radius you will actually work at. This is the real capacity of the machine.
  2. Jib length and whether it can be shortened legally to suit your site boundary and your permitted over-sailing.
  3. Free-standing height in the configuration you need — fixed base or rail-travelling, and with how many mast sections.
  4. Fatigue and corrosion evidence at weld toes, mast splices and inside closed sections. You cannot paint this away.
  5. Documentation — nameplate, serial number, original test certificate, repair history. This is what the crane is worth on the day you resell it.

Everything below is how to test each one, and what number is good.

1. Start from the lift you make, not the tonnage on the badge

A tower crane's headline load is quoted at minimum radius — typically 2.5 to 4 m from the mast centreline. Almost nobody lifts there. Concrete skips, rebar bundles, precast panels and formwork tables are lifted at 20 to 60 m. So the first calculation is not "how many tonnes do I need" but "what moment do my lifts demand".

Take the heaviest routine lift, multiply load by radius, then add the hook block and slings and a dynamic allowance:

StepWorked exampleResult
Heaviest routine loadPrecast wall panel6.0 t
Radius at the furthest pick45 m from mast—
Load moment6.0 × 45270 t·m
Hook block, slings, spreader≈ 0.4 t at the same radius+18 t·m
Dynamic / wind allowance5 % of the total+14 t·m
Required moment—≈ 302 t·m

Now compare that against the chart, not the badge. A 525 t·m machine such as the XCMG XGT8040-25 typically still gives roughly 8 to 9 t at 45 m, so 302 t·m is comfortably inside it with reserve for a two-part line and a windy day. A 250 t·m machine is at or over its limit at the same radius. Both may be advertised as "25 tonne cranes". Only one does your job.

Always read the actual chart. The figures above are typical for the class, not a substitute for the load chart that belongs to the specific serial number. Chart values change with jib length, counterweight, number of falls on the rope and out-of-service wind assumptions. A seller who cannot photograph the chart on the machine is not ready to quote you.

Tonnes or kilonewtons?

Chinese and some European nameplates use kN·m; most of Africa, the Middle East and Southeast Asia quote t·m. One tonne-metre is 9.81 kN·m, so a 6,800 kN·m crane is about 693 t·m and a 529 t·m plate is about 5,190 kN·m. Convert before you compare quotations, or you will rank two machines in the wrong order.

2. Decode the model name before you read the price

Tower crane model codes are dense and each manufacturer builds them differently. Reading them wrong is the most expensive mistake in this market, because the number that looks like the capacity often is not.

CodeWhat the parts meanReal capacity
XGT8040-2580 = jib length in metres, 40 = tip load 4.0 t, 25 = max load 25 t25 t at minimum radius, 4.0 t at 80 m
T600-32U600 = moment class, 32U = twin-trolley designation16 t per trolley on twin trolleys, 6,800 kN·m max moment
MCT370370 = nominal load moment in t·m (POTAIN MCT range)Chart-dependent; jib and counterweight vary by unit
QTZ525Chinese series code: QTZ = tower crane, self-erecting, 525 = moment in t·mSame machine as XGT8040-25 on some certificates — check both documents
7527 / 753075 = jib length in metres, 27 or 30 = tip load in hundreds of kg2.7 t or 3.0 t at 75 m

The twin-trolley case is worth spelling out because it is the one most often mis-sold. A T600-32U carries two trolleys on the jib, each rated 16 t on the nameplate. That arrangement is what gives it 6,800 kN·m of moment over an 80 m jib. It is not a 32-tonne single-hook crane, and a seller who markets it as one has either misread the plate or is hoping you will. Ask for the chart at 2.5 m radius and the answer appears immediately.

Two further traps. First, the same physical machine can appear under an assembly model on the nameplate and a QTZ series code on the certificate — that is normal, not fraud, but you should see both documents photographed in full so you can verify the mapping yourself. Second, a "7530" and a "7527" are the same crane with different jib end sections and different tip ratings; the price difference is often larger than the hardware difference.

3. Free-standing height decides whether the crane fits your site at all

Free-standing height is the tallest the crane can stand without being tied to the building or anchored to a foundation designed for overturning moment. It is configuration-dependent, and the same machine will have two quite different numbers depending on whether it sits on a fixed base or on rails.

The ZOOMLION T600-32U we list is a clean example: 78.5 m free-standing on a fixed base, but only 66.8 m in travelling configuration. Nearly 12 m of height disappears when you put the crane on rails. If your site plan assumes rail-mounted and your structural engineer assumed 78.5 m, you find out at the worst possible moment.

Three questions to settle before you shortlist:

  • What height does the building actually need, at the jib length you want? Height and jib trade against each other in the chart.
  • Are you permitted to be free-standing, or must you anchor? Anchoring needs a designed and inspected tie frame plus a foundation that takes the moment. That is engineering, not hardware.
  • Does the crane arrive with the right number of mast sections for that height? Mast sections are the most commonly missing item in a used sale. Count them against the erection drawing before you agree the price, because buying six sections separately usually costs more than the discount you negotiated.

4. Fatigue and corrosion: the two things you cannot paint over

A tower crane accumulates load cycles for its whole life. The damage shows up in predictable places, and a fresh coat of paint is exactly what hides it. Inspect in this order, and inspect before any repainting is done — a machine that has just been painted is a machine you cannot read.

Weld toes and mast splices

Cracks initiate at weld toes on the jib root, at the slewing ring mounting flange, and at the diagonal-to-chord junctions of mast sections. Look for a fine dark line running perpendicular to the weld, and for rust bleeding out of a joint that has no other reason to rust. Dye penetrant on the ten most loaded joints is inexpensive and settles the question.

Mast straightness

Measure the diagonal of each mast section and compare sections against each other. Sections from the same crane should agree closely; a section that is visibly out of square has been overloaded, dropped during a previous dismantle, or came from a different machine. Mixed sections with different serial stamps are a serious finding — the crane has been rebuilt from at least two donors.

Corrosion inside closed sections

Mast chords and jib chords are often closed profiles. Water enters at the splice bolt holes and at the top cap, and it does not leave. Tap along the chord with a small hammer and listen for the change in tone; a dead, papery sound over a length of 300 mm means section loss you cannot see. Ultrasonic thickness readings at three points per chord on two random sections cost little and are the single best predictor of remaining life on a coastal or humid-site crane.

Rope, brakes and safety devices

Hoist rope is a consumable and is priced as one. Per ISO 4309, a 6×36 class running rope in single-layer spooling is typically due for replacement at 10 visible broken wires in any 6d length or 20 in any 30d length, with immediate replacement for a broken valley wire, kink, bird-cage or diameter reduction beyond tolerance. Beyond the rope, the devices that must work are the moment limiter, height and radius limiters, slew limiters where fitted, the anemometer, and the hoist brake. A crane whose moment limiter has been "temporarily" bypassed has been operated outside its chart, and you should price that into the decision.

5. Documentation is where the residual value lives

Two used tower cranes of identical model, age and condition can differ 25 % in value on paperwork alone. The reasons are practical: without documents you cannot get a third-party inspection, cannot get insurance on site, cannot prove provenance to a future buyer, and in many jurisdictions cannot get the erection permit at all.

The minimum set is four items:

  • Nameplate, photographed legibly — manufacturer, model, serial number, year, rated moment, and the load chart if it is on the plate.
  • Original test or commissioning certificate from the manufacturer or the first inspecting authority.
  • Maintenance and repair log, including rope changes, brake work and any structural repair with the approved procedure.
  • Serial numbers that match across plate, certificate and — where stamped — the mast sections and slewing ring.

Ask for these as photographs of the actual documents, not as a description. On our own listings we photograph the plate in full and state the moment and load exactly as engraved, including where the plate and the marketing name disagree.

The 14-point inspection sheet

#CheckPass criterionHow to test
1Nameplate legibilityModel, serial, moment all readablePhotograph, then read it back
2Plate vs certificate modelMapping explained in writingCompare both documents
3Mast section diagonalsConsistent across sectionsTape measure, section by section
4Mast section serialsAll from the same craneRead the stamp on each section
5Weld toes, jib rootNo crack indicationVisual plus dye penetrant
6Slewing ring flangeNo cracks, bolts torqued and markedVisual, torque marks present
7Slewing ring backlashWithin manufacturer limit, no grease leakDial gauge, rotate loaded
8Chord wall thicknessAbove minimum for the sectionUltrasonic, 3 points per chord
9Hoist ropeBelow ISO 4309 discard countCount broken wires over 6d
10Hoist brakeHolds rated load staticallyStatic hold test, record result
11Moment limiterFunctional and calibratedTest with known load at known radius
12Limiters and anemometerAll cut-outs operateFunction test each device
13Electrical insulation≥ 1 MΩ at 500 V DCInsulation resistance tester
14CounterweightMatches the jib configurationWeigh or read cast marks, compare to chart

Items 3, 4, 8 and 14 catch the majority of serious problems, and all four can be done in a single day on site with a tape measure, an ultrasonic gauge and a torch.

Walk away from these

  • No nameplate, or a plate re-riveted over an old one. Undocumented rebuild.
  • Fresh paint everywhere and no inspection access. Repainting is the standard way to hide toe cracks and section loss.
  • "Certificate lost, but it's the same as the model." There is no such thing as a model-level certificate for a specific serial number.
  • Mast sections with different serial stamps. The crane is a composite and its chart may no longer apply.
  • Jib cut and re-welded without a revised chart. An uncertified structure, whatever the seller says about "it's been fine for years".
  • Moment limiter bypassed or "not needed for export". The crane has been run outside its chart.
  • Seller cannot state free-standing height for the configuration being sold. They do not know the machine well enough to sell it.

Match the moment class to the job

JobTypical heightWorking radiusMoment class to look at
Low-rise housing, 5–9 floors30–40 m40–55 m250–400 t·m, 60 m jib
Mid-rise commercial, 10–20 floors50–65 m50–65 m400–600 t·m, 65–70 m jib
High-rise, 20 floors and above70 m+ anchored55–70 m600–800 t·m with climbing frame
Precast and heavy panelsAnyLong, load-limitedMoment-led, twin trolley helps
Infrastructure, bridges, plantsLow but wide70–80 m600 t·m and above, 75–80 m jib

If two classes both work on paper, take the smaller one. A larger crane costs more to transport, more to erect, more in foundation, and more per month in inspection and maintenance, and its extra capacity is dead capital unless you have the lifts for it.

What it costs, and why we do not publish a number

Used tower crane pricing is driven by moment class, age, remaining fatigue life, configuration completeness (mast sections and counterweight are half the argument) and documentation — in roughly that order. Two cranes of the same model can legitimately differ by a third on those factors alone.

We quote per order rather than publishing a list price, because the honest number depends on which configuration you need, what shipping terms you want and what documentation is being assembled for the specific unit. If you send us the lift, the radius, the height and the destination port, you get a costed answer instead of a range. Our stock and the plate data for each unit are on the stock page, and the two large-crane records are written up in full: ZOOMLION T600-32U and XCMG XGT8040-25.

Disclosure. We sell used tower cranes, so this guide is not neutral about whether you should buy one. It is deliberately specific about where the failures are, because a buyer who inspects properly comes back for a second machine and a buyer who is surprised does not.

Frequently asked

What is the difference between rated moment and maximum load?

Maximum load is the heaviest single lift, available only at minimum radius, usually 2.5 to 4 m. Rated moment is load times radius across the whole working range. A 25 t crane may lift 25 t at 2.8 m and only 4 t at 80 m. Rated moment describes the machine; maximum load describes one point on its chart.

How do I convert t·m to kN·m?

Multiply tonne-metres by 9.81. A 525 t·m crane is about 5,150 kN·m; a 6,800 kN·m crane is about 693 t·m. Convert before comparing two quotations.

Can I shorten the jib to fit a tight site?

On most saddle-jib cranes yes, but it needs the correct shorter jib sections, matching counterweight and a revised chart from the manufacturer. A jib cut and re-welded on site without a new chart is an uncertified structure and will fail inspection.

How many broken wires mean the hoist rope must be replaced?

Per ISO 4309, a 6×36 class running rope in single-layer spooling is typically due at 10 broken wires in any 6d length or 20 in any 30d length. Any broken valley wire, kink, bird-cage or excess diameter reduction means replace now. Check the table for your rope class.

Is a crane with no nameplate worth buying?

Only at scrap-plus-rebuild value. Without the plate you cannot verify identity or obtain a parts match, and most inspection bodies will refuse to certify it.

How long does dismantling and loading take?

A 60 to 80 m free-standing crane typically takes 5 to 10 working days to dismantle with a suitable mobile crane, plus 2 to 4 days to load and lash. Anchored or climbing configurations take longer because the base has to be cut out.